RSS | Advanced Search | Site Map | Text Size a- A+
City of Colorado Springs
We Create Community

NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

RODEO
04222 INTEGRATION LP

Review DateStatusComment(s)
5/4/2020 DisapprovedThank Joseph, I will check that in for review. I did see that the application did not provide the following: 1. Design standard of the 500 gal horizontal tank* 2. Cut sheets of fuel dispensing equipment (hose, pumps, nozzles, etc) 3. Method of vehicle protection in accordance with Section 312 of the fire code 4. The last page appears to show a very crowded area where the tanks are located(it's in black and white and the scanner did a poor job keeping the details), if there is that amount of stuff around the tanks I will need to know what is stored near it and how far away to ensure combustibles are stored at appropriate distances.


 

Contact Us: Email Us - Call: 385-CITY (719-385-2489) - RSS - Privacy, Linking and ADA Policies - designed, developed by projecta.com

printer friendly version Printer friendly version