NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

PROJECT JUNGLE
04303 GRINNELL BLVD

Review DateStatusComment(s)
4/27/2020 I2015 IFC - SEPARATION DISTANCES FOR TANKS: Tank Size: 787 Gallons Miimum distance from LOT LINE of a lot which is or can be built upon, including the opposite sdie of a public way: 15 Feet Minimum distance from nearest side of any PUBLIC WAY or from nearest important building on the same property: 5 Feet (2015 IFC ?TABLE 5705.3.4(2))
IThis permit covers the three fuel pods for refilling the three mobile generators. No permit required for the three mobile generators.
FYIAST - TANK INFORMATION Tank Description: Fuel Pod tank with a capacity of 787 gallons. Contents: Diesel Type of containment:UL 142
I2015 IFC - SMOKING AND OPEN FLAME. Signs shall be posted in storage areas prohibiting open flames and smoking. Signs shall comply with Section 5703.5. (2015 IFC ?5704.2.3.1)
FYI2015 IFC - PROTECTION FROM VEHICLES. Guard posts or other approved means shall be provided to protect piping, valves or fittings subject to vehicular damage in accordance with Section 312. (2015 IFC ?5703.6.4)
FYIINSPECTION REQUIRED. An inspection of this hazardous materials installation/process is required prior to final Certificate of Occupancy/occupancy of the building/commencement of hazardous materials operations. To schedule the hazardous materials inspection, please call 719-385-5978 and follow prompts to schedule the inspection. Please have the plan review number ready before calling.
4/7/2020 DisapprovedDetailed Site plan still not provided. Show exactly where fuel pods are proposed to be.
3/23/2020 DisapprovedSite map appears to have been copied as black/white instead of in color and does not show details of locations of fuel pods and generators. Recommend using construction site grading plan or similar. Provide updated detailed drawing showing details of tank locations (fuel pods/generators).
DisapprovedPlease verify that vent piping of fuel pods shall terminate at least 12' above grade in accordance with 5706.2.4.2 and 5704.2.7.3.3.
DisapprovedProvide details of pumps, fittings, piping, and hoses of fueling pods to ensure they are approved for this use. (2015 IFC 5706.2.5.1.1)
DisapprovedPlease verify address - address on plans is 7770 Milton E Proby Parkway, which is the address for the airport. This is not the correct address for this project; please verify which address below is the correct address: 1. DCS1 - 7704 Milton E Proby Parkway 2. Project Jungle - 4303 Grinnell Blvd 3. Project Rodeo - 4222 Integration Loop
AttentionTank dispensing outside of buildings shall comply with Section 5706.2.
FYIAST - TANK INFORMATION Tank Description: -- tank with a capacity of --- gallons. Contents: Type of containment: Tank Location: This tank is located --- ft from the --- side of the building and --- ft from ---.
FYIINSPECTION REQUIRED. An inspection of this hazardous materials installation/process is required prior to final Certificate of Occupancy/occupancy of the building/commencement of hazardous materials operations. To schedule the hazardous materials inspection, please call 719-385-5978 and follow prompts to schedule the inspection. Please have the plan review number ready before calling.


 