NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

PIKES PEAK LIBRARY EAST LIBRARY BRANCH
05550 UNION BLVD

Review DateStatusComment(s)
2/26/2020 DisapprovedSite plan showing location of the tank proposed to be removed not provided. Please provide site plan showing location of the tank.
Disapproved2015 IFC - REMOVAL. Removal of above-ground and underground tanks shall be in accordance with all of the following: 1. Flammable and combustible liquids shall be removed from the tank and connected piping. 2. Piping at tank openings that is not to be used further shall be disconnected. 3. Piping shall be removed from the ground. Exception: Piping is allowed to be abandoned in place where the fire code official determines that removal is not practical. Abandoned piping shall be capped and safeguarded as required by the fire code official. 4. Tank openings shall be capped or plugged, leaving a 1/8-inch to 1/4-inch-diameter (3.2 mm to 6.4 mm) opening for pressure equalization. 5. Tanks shall be purged of vapor and inerted prior to removal. 6. All exterior above-grade fill and vent piping shall be permanently removed. Exception: Piping associated with bulk plants, terminal facilities and refineries. (2015 IFC ?5704.2.14.1) Tank removal procedures not provided; please provide procedures that will show compliance with the above requirements, especially with the inerting of the tank.


 