NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

DENTAL CARE ALLIANCE SUITE 110
01644 MEDICAL CENTER PT

Review DateStatusComment(s)
3/31/2020 Approved/Corrected1. 2018 version of NFPA 99 indicated on med gas plan 2. Category 2 Dental gas system indicated on med gas plan. 3. Maximum level of sedation to be performed will be moderate sedation according to medical gas plans. 5. Piping shall comply with the applicable sections in 15.1, 15.2, and 15.3 of 2018 NFPA 99 6. 2 headers with one average day's supply provided for both Nitrous and Oxygen 7. Location of Dental gas alarm panel indicated on medical gas plans. It shall be in a continuously (during business hours) monitored location.
AttentionEXCEEDS PERMIT QUANTITIES; ANNUAL HAZARDOUS MATERIALS OPERATIONAL PERMIT REQUIRED. COLLECT REQUIRED INFORMATION FOR ANNUAL PERMITTING.
AttentionHAMMERS: The information from this permit application must be entered into the HAMMERS program and added to the facilities hazardous materials information. Visit the following link: https://hammers.springsgov.com/ to add the information to the facility.
AttentionINSPECTION REQUIRED. An inspection of this hazardous materials installation/process is required prior to final Certificate of Occupancy/occupancy of the building/commencement of hazardous materials operations. To schedule the hazardous materials inspection, please call 719-385-5978 and follow prompts to schedule the inspection. Please have the plan review number ready before calling.
FYICREDENTIALS AND CERTIFICATIONS. American Society of Sanitary Engineers (ASSE) Medical Gas Installer, Medical Gas Verifier and Brazing certification credentials, or documents shall be required prior to commencement of work, and on site and available AT ALL TIMES for inspection by the CSFD. CREDENTIALS SHALL BE CURRENT. Performance Testing is required per NFPA 99, section 5.1.12. Performance Criteria and Testing. Performance testing documentation and inspection is subject to field verification by the Fire Inspector.
FYIMED GAS INSPECTIONS. Medical Gas system piping installation requires MULTIPLE INSPECTIONS by the CSFD due to installation requirements and procedures. ALL PORTIONS OF PIPING SYSTEMS SHALL REQUIRE INSPECTION; no piping shall be sealed or concealed prior to inspection. Contact the CSFD Office of the Fire Marshal at 385-5978 for an inspection schedule for this project. All paperwork, documentation, installer/verifier certifications, and needed test equipment shall be available upon Inspector's request.
FYIGENERAL. Medical gas systems shall be installed and inspected by credentialed American Society of Sanitary Engineering (ASSE) 6010 medical gas system installers, ASSE 6015 bulk medical gas system installers, ASSE 6020 medical gas system inspectors, and ASSE 6030 medical gas verifiers. Contractor shall be responsible for compliance with all local, state or federal codes, standards, and appropriate industry practices. (2015 IFC ?5306.1)
3/10/2020 DisapprovedThe version of NFPA 99 used in the design has not been provided on the medical gas plans (ie, P-102)
DisapprovedThe category of dental system has not been provided on the medical gas plans (ie, P-102). Comment response indicated "Category 2 Medical gas system"; however, this is incorrect as it shall be a Category 2 DENTAL system, which pulls requirements from Chapter 15 rather than the medical gas system per Chapter 4. Please verify, correct, AND put this Category of DENTAL system ON THE PLANS.
DisapprovedLetter from dentist claifying level of sedation not attached to plans. This SHALL be attached to the plans before plans can be approved.
DisapprovedComment response indicates that the anestitizing spaces and critical care spaces will be part of "delayed submittal by installer". It appears this references a "deferred" submittal; however, a deferred submittal is not allowed for medical gas plans. Medical gas plans shall be submitted as part of construction plans.
DisapprovedComment response indicates that the dental gas alarm panel will be part of "delayed submittal by installer". It appears this references a "deferred" submittal; however, a deferred submittal is not allowed for medical gas plans. Medical gas plans shall be submitted as part of construction plans.
DisapprovedPHONE CONVERSATION REQUEST: To help ensure the disapproved comments are understood and addressed so that the second review results in acceptance from the fire department, please contact Stefan Manning, as soon as possible. They may be reached at 719-385-7356 and/or stefan.manning@coloradosprings.gov.
2/25/2020 FYICHEMICAL INVENTORY, AS DECLARED OXIDIZING GAS = 1541 scf 2 Oxygen tanks -400 scf total 2 Nitrous Oxide tanks - 977 scf total 2 small oxygen tanks - 47 scf total 2 smal nitrous oxide tanks - 117 scf total Total amount - 1541 scf (MAQ is 1500 x 2 = 3000 scf due to sprinklers)
FYICONTROL AREAS, AS SHOWN ON THIS SUBMITTAL ARE AS FOLLOWS Medical gas room
DisapprovedAs this Oxygen and vacuum system fall under the scope of NFPA 99, the following information is required ON THE MEDICAL GAS PLANS: 1. Version of NFPA 99 used for design (note that CSFD has adopted the 2018 version of NFPA 99, NO OTHER VERSIONS ACCEPTED). 2. Category of DENTAL gas system (Category 1, 2, or 3) as defined in NFPA 99 Chapter 15. 3. Maximum level of sedation to be performed in the facility - this must be provided on letterhead of the doctor or the facility's healthcare governing body. This must use terminology and definitions per 3.3.66 and 3.3.136 of 2018 NFPA 99. 4. Mark any anesthetizing spaces or critical care spaced on the medical gas plans. 5. Please verify piping materials for vacuum and oxygen piping. Piping shall comply with the applicable sections in 15.1, 15.2, and 15.3 of NFPA 99 as applicable (based on Category of system). 6. Additionally, NFPA 99 usually requires each manifold header to have at least 2 gas cylinders on each header, which would require a total of 4 cylinders not 2. Please read the requirements found in NFPA 99 and verify you are using the correct number of cylinders and update the HMIS as necessary. 7. Provide location of Dental gas alarm panel on medical gas plans. It shall be in a continuously (during business hours) monitored location.
Attention2015 IFC - ONE-HOUR INTERIOR ROOM. Where an exterior wall cannot be provided for the room, automatic sprinklers shall be installed within the room. The room shall be exhausted through a duct to the exterior. Supply and exhaust ducts shall be enclosed in a 1-hour-rated shaft enclosure from the room to the exterior. Approved mechanical ventilation shall comply with the International Mechanical Code and be provided at a minimum rate of 1 cubic foot per minute per square foot [0.00508 m3/(s u m 2)] of the area of the room. EXCEPTION: When the building is not provided with a fire sprinkler system, and the room does not exceed 24 square feet; a single ordinary temperature, quick response sprinkler head from the domestic water supply after the building#s backflow preventer is allowed. The feed to the sprinkler shall have a quarter turn isolation valve to facilitate changing the sprinkler. This valve must be chained and locked in the open position and be labeled indicating the valve function. For this sprinkler head configuration, no design area calculations or sprinkler reviews are required. A minimum temperature of 40?F must be maintained in this room and anywhere the water supply piping is run. (2015 IFC ?5306.2.2)
FYI2015 IFC - ONE-HOUR EXTERIOR ROOMS. A 1-hour exterior room shall be a room or enclosure separated from the remainder of the building by fire barriers constructed in accordance with Section 707 of the International Building Code or horizontal assemblies constructed in accordance with Section 711 of the International Building Code, or both, with a fire-resistance rating of not less than 1 hour. Openings between the room or enclosure and interior spaces shall be self-closing smoke- and draft-control assemblies having a fire protection rating of not less than 1 hour. Rooms shall have not less than one exterior wall that is provided with not less than two nonclosable louvered vents. Each vent shall have a minimum free opening area of 24 square inches (155 cm 2) for each 1,000 cubic feet (28 m 3) at normal temperature and pressure (NTP) of gas stored in the room and shall be not less than 72 square inches (465 cm 2) in aggregate free opening area. One vent shall be within 6 inches (152 mm) of the floor and one shall be within 6 inches (152 mm) of the ceiling. Rooms shall be provided with not less than one automatic sprinkler to provide container cooling in case of fire. (2015 IFC ?5306.2.1)


 