JAMES IRWIN CHARTER SCHOOL MAIN
05525 ASTROZON BLVD

Review DateStatusComment(s)
3/19/2020 FYI*****(STANDARD COMMENT) This project is: James Irwin Charter School, 5525 Astrozon Blvd, Addition State School Project This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI*****(STANDARD COMMENT) The fire sprinkler system is being installed by: FRONTIER FIRE CSFD does not allow any combustibles into a building until a sprinkler system has passed it's final acceptance test performed by CSFD Inspector's.
FYI*****(STANDARD COMMENT) REMODEL SCOPE OF WORK: Area/scope of work is -149---- SPRINKLERS IN SUITE/FLOOR/AREA ----LIBRARY ADDITION--------of the building. Flex Connections: YES Brand: VICFLEX Equivalent Length: 48 INCH = 32 FEET UL 2443/FM 1637 Complaint: YES
FYI(STANDARD COMMENT) LICENSED INSTALLER/SERVICE TECHNICIAN An On-Site Installer/Service TechniciaN shall supervise all on-site work on any fire protection system. This On-Site Installer shall have a current Installer Certificate (RBD Wallet Card), on his/her person, while on the job site.
FYI(STANDARD COMMENT) CPVC ROUGH INSPECTIONS: Sprinkler Heads shall not be installed on CPVC piping until CSFD has witnessed a visual rough-inspection of all piping and granted permission to install sprinklers.
FYI(STANDARD COMMENT) CONCEALED SPACES - This plan did not provide any information on combustible concealed spaces. NFPA 13 requires that "All concealed spaces enclosed wholly or partially by exposed combustible construction shall be protected by sprinklers". There are several specific allowances to this section that allow for the omission of sprinklers. If there are combustible concealed areas found during the installation of the system that do not meet the requirements of the NFPA 13, then these areas will be required to be sprinkled. (NFPA 13:8.15.1) IT IS THE RESPONSIBILITY OF THE INSTALLER TO MAKE SURE THAT THE SYSTEM IS INSTALLED IN ACCORDANCE WITH THE STANDARD.
FYI(STANDARD COMMENT) FREEZING CONDITIONS It is the designer's responsibility to provide the building owner with a system design that will continue to function reliably even under adverse temperature conditions. The sprinkler contractor must be conscious of field conditions that may affect the performance of their system, such as drafts, disturbed insulation, installation along exterior walls, etc. and incorporate such conditions into a reliable design.
Attention(STANDARD COMMENT) CERTIFICATE OF INSTALLATION: It is the installer's responsibility to certify through this form (attached to the plans) that the system has been properly installed and tested. NOTE! CSFD will no longer be providing these forms as they are now available online at: https://coloradosprings.gov/sites/default/files/inline-images/installer_certificaiton.xlsx The form is to be filled out in its entirety PRIOR TO THE ARRIVAL OF THE FIRE INSPECTOR conducting the final inspection and/or acceptance test of the system. FINAL INSPECTIONS WILL NOT BE CONDUCTED WITHOUT THIS FORM BEING COMPLETED.
FYI(STANDARD COMMENT) AS-BUILT PLANS All deviations from approved plans shall be documented and submitted to CSFD for archival. Reviews will not be conducted on as-builts, as these field changes are often verified as compliant by the fire inspectors. All as-built plans shall be conspicuously marked as such. Any changes requiring approval prior to Final shall be submitted as a REVISION.
Attention*****(STANDARD COMMENT) SCHEDULING INSPECTIONS Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests in with ample time to allow scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2013-1234 - HS-1) The CSFD Approved sets of plans are to be on site for all inspections.
FYI(STANDARD COMMENT) ROUGH VISUAL INSPECTIONS: Rough Visual inspections shall be completed PRIOR TO any bucket tests or final inspections.
FYI(STANDARD COMMENT) CONCEALED WORK: The fire sprinkler piping shall not be covered up by walls, sheetrock, ceiling tiles, etc... prior to the CSFD visual inspections of the piping. If the piping is covered, and the inspectors cannot inspect it as is required by Fire Code, the walls,sheetrock, ceiling tiles, etc... will be required to be removed. If this means that finished ceilings will need to be removed, this will be required to be done! (IFC 106.3)
FYI(STANDARD COMMENT) PLAN REVIEW/PERMIT FEES: All fire department fees are to be paid prior to issuance of any permits. These fees must be paid directly to the Colorado Springs Fire Department - Development Review Enterprise - at 2880 International Circle - Suite 200-7.
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the 2003 International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)
FYI(STANDARD COMMENT) DEW REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Doreen "Dee" Withee, PE Fire Protection Engineer II, CSFD 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7361 dwithee@springsgov.com
2/19/2020 FYI*****(STANDARD COMMENT) This project is: James Irwin Charter School, 5525 Astrozon Blvd, Addition State School Project This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI(STANDARD COMMENT) CLT REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Wyman "Chip" Taylor II, PE Fire Protection Engineer I 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7303 wtaylor@springsgov.com
Disapproved*****(STANDARD COMMENT) DISAPPROVED COMMENTS The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments: 1. General note 1 states that you are using OH II design, but your plans do not specify where this design is being used. 2. Approved construction plans state that the square footage of the addition is 15,131 sq ft. With this corrected square footage, you are exceeding the 52,000 sq ft maximum system size. 3. General note 17 states that the maximum square footage for light hazard heads is 225 sq ft. This maximum square footage is not supported by the hydraulic calculations. 4. Provide cut sheets for flex drops being used. 5. Darken site plan. Site plan is too light and will also not scan for archiving. 6. Correct code reference for sprinkler protection for soffits against walls. There is no (b) in the code section provided. 7. Pendants in NE corner of library are too far off wall to protect under soffits against walls. 8. Darken walls and ceilings on 1st and 2nd floor, they are too light to scan for archiving. 9. Show locations of lights and diffusers on plans. 10. Storage Room 221 is an ordinary hazard room. Head in this room exceeds 130 sq ft. 11. hydraulic calculations must extend to the point where the water supply is know (i.e. the hydrant). 12. Correct water supply information and 10% reduction. Flow provided by CSU is at 20 psi, so you must use 20 psi as your residual pressure. 10% subtracted from static pressure must also be subtracted from residual pressure, so that the 100% and 90% water supply curves are parallel. 13. Review stopped. No review of hydraulic calculations could be performed until corrections above are made. Also review the disapproved plans for additional written comments prior to submittal of new plans.
Attention(STANDARD COMMENT) THE DISAPPROVED ITEMS MAY NOT CONSITITUE A COMPLETE LIST OF VIOLATIONS. It is the responsibility of the design professional to conduct a complete re-review of the plans for additional violations of the adopted codes/standards and incorrect information prior to resubmitting.
FYI(STANDARD COMMENT) CORRECTIONS All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax, email or verbally.


 