BLR VILLAGE 3 GUARD SHACK
09178 BRAEMORE HTS

Review DateStatusComment(s)
2/6/2020 FYI*****(STANDARD COMMENT) This project is: Banning Lewis Ranch, Village 3 Guard Shack: 9178 BraemoreHts - new guard house for single family development Date of Plans: 11.14.19 You can access our web site for the latest fire department plan review comments: www.coloradosprings.gov search for Plan and Construction Review.
Attention(STANDARD COMMENT) CONSTRUCTION SPLICES You are strongly encouraged to have any splices that may occur during this project, reviewed by CSFD. Failure to do so, can result in coordination issues that could prevent a final inspection from being completed, thus delaying the issuance of a Certificate of Occupancy.
FYI(STANDARD COMMENT) SHELL BUILDINGS: Due to the lack of an occupancy classifiction, door hardware is reviewed to be passage hardware only. There is no review of exit signs/emergency lighting due to the lack of an occupancy classification. Door hardware may be required to be changed to be compatible with occupancy class and/or occupant load upon tenant finish.
FYI(STANDARD COMMENT) 150-FOOT ACCESS: 2015 IFC 503.1.1 Fire apparatus access roads shall be provided for every structure constructed or moved into or within the jurisdiction and shall be extended to within 150-feet of all exterior portions of the first story of any building.
FYI(STANDARD COMMENT) ACCESS FOR FIREFIGHTING: 2015 IFC 3310 Approved vehicle access for firefighing shall be provided to all construction/demolition sites. Vehicle access shall be either temporary or permanent roads, capable of supporting vehicle loading under all weather conditions. Vehicle access shall be maintained until permanent fire apparatus access roads are available.
FYI(STANDARD COMMENT) FIRE FLOW TESTING - NEW HYDRANTS: 2015 IFC 3312 All actual hydrant flow tests shall be conducted and witnessed by CSFD prior to the start of construction or the arrival of combustible material on site. It is the responsibility of the owner or their designated representative to ensure an approved water supply is provided.
FYI(STANDARD COMMENT) CONTACTS FOR FLOW TESTING HYDRANTS PUBLIC/CITY OWNED HYDRANTS: Contact SEAN HIGBEE, CSU at 668-4595 or via email at shigbee@csu.org to schedule an ACTUAL flow test. Be sure to provide them with a CSFD plan review number to include with their flow reports. CSFD need not be present when City Utilities flow tests hydrants as we will accept their reports. PLEASE ALLOW 1-2 WEEKS NOTICE PRIVATE HYDRANTS: Contact your assigned inspector to schedule a flow test of PRIVATE OWNED hydrants. A contractor capable of performing the test will be required as CSFD Inspectors WITNESS only. CSFD will not accept flow test results we have not witnessed.
FYI(STANDARD COMMENT) ADDRESSING: 2015 IFC 505.1; 2017 RBC 312 Address shall be posted on street addressed side of structure. Minimum 5" numbers with 1/2" stroke. Contrasting color to background. (2009 IFC 505.1)
FYI(STANDARD COMMENT) PREMISES IDENTIFICATION DURING CONSTRUCTION: 2017 RBC 312 Temporary address numbers shall be posted at the entrance to the construction site. The numbers shall be legible and visible from the street(s) or road(s) on which the building is addressed. The address numbers shall be at least 12 inches in height. Temporary signs may be made of wood, plastic, or metal. They shall be weather resistant and be maintained until replaced by permanent address numbers.
FYI*****(STANDARD COMMENT 10) SCHEDULING INSPECTIONS Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests in with ample time to allow scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2013-1234 - HS-1) The CSFD Approved sets of plans are to be on site for all inspections.
FYI*****(STANDARD COMMENT) DISAPPROVED ITEMS ADDRESSED The plans have been resubmitted and all the disapproved comments have been addressed and/or corrected as follows: 1. Exhibit showing secondary entry off Dublin which gives fire response crews access to hydrants on way to this structure has been provided and accepted.
FYI(STANDARD COMMENT) DEW REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Doreen "Dee" Withee, PE Fire Protection Engineer II, CSFD 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7361 dwithee@springsgov.com
FYI(STANDARD COMMENT) REVIEWS: 2015 IFC 105.4.4 Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
FYI(STANDARD COMMENT) PERMITS Insure all applicable permits are obtained from the Regional Building Department and the Colorado Springs Fire Department for the work that is being done at this site.
12/30/2019 DisapprovedPrevious comments not addressed - applicant simply referred to the water plans for the subdivision rather than providing the information requested about hydrants along main road: show existing hydrants along the main road or revise approved water plans to add a hydrant at the entrance to this development. Hydrants within the development are not within spacing limitations for this facility and are not in a readily usable or tactically available location for an emergency at the guard station, as the engines would have to drive past the hazard to attain a fire hydrant. Again, provide information on hydrants along the main road accessing the guard shack and development or show another route where the subdivision proposed hydrants are accessible enroute to the guard shack.
11/22/2019 FYI*****(STANDARD COMMENT) This project is: Banning Lewis Ranch, Village 3 Guard Shack: 9178 BraemoreHts Date of Plans: 11.4.19 You can access our web site for the latest fire department plan review comments: www.coloradosprings.gov search for Plan and Construction Review.
Disapproved*****(STANDARD COMMENT 19) DISAPPROVED COMMENTS The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments: 1. There are no hydrants in proximity for fire department use. show existing hydrants along the main road or revise approved water plans to add a hydrant at the entrance to this development. Also review the disapproved plans for additional written comments prior to submittal of new plans.
FYI(STANDARD COMMENT) CORRECTIONS All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax, email or verbally.
FYI(STANDARD COMMENT) RESUBMITTALS Re-reviews may be submitted back to the CSFD by direct submittal at the Construction Services counter, or through the Regional Building Department's routing system.
FYI(STANDARD COMMENT) DEW REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Doreen "Dee" Withee, PE Fire Protection Engineer II, CSFD 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7361 dwithee@springsgov.com
FYI(STANDARD COMMENT) REVIEWS: 2015 IFC 105.4.4 Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.


 

Contact Us: Email Us - Call: 385-CITY (719-385-2489) - RSS - Privacy, Linking and ADA Policies - designed, developed by projecta.com