NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

RODEO
04222 INTEGRATION LP

Review DateStatusComment(s)
5/26/2020 FYI*****This project is: Project Rodeo, 4222 Integration Lp: new multi level automated distribution and fulfillment facility This plan review is based on the requirements found within the adopted edition of the International Building Code, International Fire Code and the related standards.
FYI*****SCOPE OF WORK: Site water & Utility Plan
Attention(STANDARD COMMENT) READY FOR SIGNATURES: The water plans appear ready for signature. Please provide one hard copy for CSFD records along with your final copies for our signature. Be sure you have addressed any red-lined comments.
FYI*****RED-LINED COMMENTS The following RED-LINED items are to be corrected prior to signature and/or final inspection: 1. Correct building data on sheet GI100 to match requirments from IFC Appendix C for number of hydrantes requried, average hydrant distance and maximimum hose lay. 2. Add additional hydrant at the NW corner of the building per previous discussions with CSFD. 3. Provide additional note on plans stating that remote FDC piping must be visually inspected by CSFD prior to burial.
Attention***** 2015 IFC B105 FIRE FLOW REQUIREMENT: Size of Bldg. --4000000000--- sq ft Construction Type ---IA--- Fire Sprinklers Y--X--- N----- Required GPM: --3000--- gpm Minimum # of hydrant(s) required: --3--- Max AVG spacing between hydrants: ---400-- ft Max hose lay: --225--- ft
FYI*****FIRE FLOW/HYDRANT REQUIREMENTS MET: On this site fire flows are --3500-- gpm, and the numbers of hydrant(s) are --Adequate-- based on a THEORETICAL Report. This site, based upon the provided theoretical modeled fire flows, appear to meet the minimum flow requirements and/or the number of hydrant(s) for this structure.
FYIPRIVATE FIRE HYDRANTS: Private fire hydrants shall be recorded with the title at the Clerk and Recorder's Office
FYI2015 IFC TABLE C105.2 HYDRANT PAINTING REQUIREMENT: Fire hydrants shall be painted in compliance with the adopted fire code. By using this scheme, emergency response crews are provided a quick way to decipher how much water is available.
FYI*****2019 NFPA 14: 6.4 FIRE DEPARTMENT CONNECTION: Pump House The fire department connection is located on the --North--- side of the building and is within ---41-- feet of a fire hydrant. Remote Free Standing (NE Corner) The fire department connection is located on the --NE--- side of the building and is within ---20-- feet of a fire hydrant.
FYICONTACTS FOR FLOW TESTING HYDRANTS PUBLIC/CITY OWNED HYDRANTS: Contact SEAN HIGBEE, CSU at 668-4595 or via email at shigbee@csu.org to schedule an ACTUAL flow test. Be sure to provide them with a CSFD plan review number to include with their flow reports. CSFD need not be present when City Utilities flow tests hydrants as we will accept their reports. PLEASE ALLOW 1-2 WEEKS NOTICE PRIVATE HYDRANTS: A contractor capable of performing the test will be required as CSFD Inspectors WITNESS only. CSFD will not accept flow test results we have not witnessed.
FYI2019 NFPA 24 10.10.2 REMOTE FIRE DEPARTMENT CONNECTION INSPECTIONS Remote Fire Department Connections shall be flushed and hydrostatically tested in accordance with NFPA 24 for underground mains and fire lines.
FYIFIRE FLOW TESTING - NEW HYDRANTS: 2015 IFC 3312 All actual hydrant flow tests shall be conducted and witnessed by CSFD prior to the start of construction or the arrival of combustible material on site. It is the responsibility of the owner or their designated representative to ensure an approved water supply is provided.
FYI*****SCHEDULING INSPECTIONS Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests with at least 5 business days lead time to allow scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2013-1234 - HS-1) The CSFD Approved sets of plans are to be on site for all inspections.
FYIPLAN REVIEW/PERMIT FEES All fire department fees are to be paid prior to issuance of any permits. These fees must be paid directly to the Colorado Springs Fire Department - Development Review Enterprise - at 2880 International Circle - Suite 200-7.
FYIREVIEWS: 2015 IFC 105.4.4 Colorado Springs Fire Department plan reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
FYICLT REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Wyman "Chip" Taylor II, PE Fire Protection Engineer I 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7303 wyman.taylor@coloradosprings.gov
4/29/2020 AttentionSee CN review comments about preliminary hydant spacing reiview (hydrants are currently at 462 ft aferage spacing requiring respaicng and additional hydrant). CSFD is allowing the CN plans to be approved prior to reivew and approval of FH plans (per discussion with FPE Taylor and Withee).


 