NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

 
   

Review DateStatusComment(s)
2/14/2020 FYI*****This project is: Polaris Pointe Trampoline Center Lot 2 Polaris Pointe Shops Filing 3A This plan review is based on the requirements found within the adopted edition of the International Building Code, International Fire Code and the related standards.
FYI*****SCOPE OF WORK: Water and fire line utility plans for new amusement building
Attention(STANDARD COMMENT) READY FOR SIGNATURES: The water plans appear ready for signature. Please provide one hard copy for CSFD records along with your final copies for our signature. Be sure you have addressed any red-lined comments.
FYI*****RED-LINED COMMENTS The following RED-LINED items are to be corrected prior to signature: 1. Delete node B hydrant at NE corner of the building - coverage is provided by existing hydrants along Spectrum Lp 2. Relocate node A hydrant from SW corner of the building to the SE corner of the building. this will provided for FDC coverage and maximize the hydrant usage for the next lot over to the east.
Attention***** 2015 IFC B105 FIRE FLOW REQUIREMENT: Size of Bldg. --35,422--- sq ft Construction Type --II-B---- Fire Sprinklers Y-XXX---- Required GPM: -2000---- gpm Minimum # of hydrant(s) required: --2--- Max AVG spacing between hydrants: ---450-- ft Max hose lay: --225--- ft
FYI*****FIRE FLOW/HYDRANT REQUIREMENTS MET: On this site fire flows are --4000-- gpm, and the numbers of hydrant(s) are ---3- based on a THEORETICAL Report. This site, based upon the provided theoretical modeled fire flows, appear to meet the minimum flow requirements and/or the number of hydrant(s) for this structure.
FYI2015 IFC TABLE C105.2 HYDRANT PAINTING REQUIREMENT: Fire hydrants shall be painted in compliance with the adopted fire code. By using this scheme, emergency response crews are provided a quick way to decipher how much water is available.
FYI*****2019 NFPA 14: 6.4 FIRE DEPARTMENT CONNECTION: The fire department connection is located on the --SOUTH--- side of the building and is within --100 FEET--- feet of a fire hydrant.
FYICONTACTS FOR FLOW TESTING HYDRANTS PUBLIC/CITY OWNED HYDRANTS: Contact SEAN HIGBEE, CSU at 668-4595 or via email at shigbee@csu.org to schedule an ACTUAL flow test. Be sure to provide them with a CSFD plan review number to include with their flow reports. CSFD need not be present when City Utilities flow tests hydrants as we will accept their reports. PLEASE ALLOW 1-2 WEEKS NOTICE PRIVATE HYDRANTS: A contractor capable of performing the test will be required as CSFD Inspectors WITNESS only. CSFD will not accept flow test results we have not witnessed.
FYIFIRE FLOW TESTING - NEW HYDRANTS: 2015 IFC 3312 All actual hydrant flow tests shall be conducted and witnessed by CSFD prior to the start of construction or the arrival of combustible material on site. It is the responsibility of the owner or their designated representative to ensure an approved water supply is provided.
FYIFIRELINE INSPECTIONS: State regulations mandate a certified fire inspection conduct both a Visual inspection and the hydrostatic and flush tests. Be sure to call us out early to conduct a visual inspection prior to the fireline being buried.
FYI*****SCHEDULING INSPECTIONS Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests with at least 5 business days lead time to allow scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2013-1234 - HS-1) The CSFD Approved sets of plans are to be on site for all inspections.
FYIPLAN REVIEW/PERMIT FEES All fire department fees are to be paid prior to issuance of any permits. These fees must be paid directly to the Colorado Springs Fire Department - Development Review Enterprise - at 2880 International Circle - Suite 200-7.
FYIREVIEWS: 2015 IFC 105.4.4 Colorado Springs Fire Department plan reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
FYIDEW REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Doreen "Dee" Withee, PE Fire Protection Engineer II, CSFD 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7361 dee.withee@coloradosprings.gov
10/21/2019 FYI*****(STANDARD COMMENT) This project is: Polaris Pointe Trampoline Center. located along the north leg of Spectrum Loop west of Voyager This plan review is based on the requirements found within the adopted edition of the International Building Code, International Fire Code and the related standards.
FYI*****(STANDARD COMMENT) SCOPE OF WORK: -----MAIN EXTENSION --XX---UTILITY SERVICE PLAN -----Domestic Only - No Fire Inspection Required --XX---Fire Line --XX---WATER PLAN --XX---Site Specific -----Subdivision - No Fire Inspection Required
Attention(STANDARD COMMENT) READY FOR SIGNATURES: The water plans appear ready for signature as long as all disapproved comments have been addressed. Please provide one hard copy for CSFD records along with your final copies for our signature.
FYI*****(STANDARD COMMENT) RED-LINED COMMENTS The following RED-LINED items are to be corrected prior to final inspection: 1. Provide fire line integrity test information on your plans.
Attention***** 2015 IFC B105 FIRE FLOW REQUIREMENT: Size of Bldg. -35,442---- sq ft Construction Type --IIB---- Fire Sprinklers Y--X--- N----- Required GPM: --2000--- gpm Minimum # of hydrant(s) required: --2--- Max AVG spacing between hydrants: ---450-- ft Max hose lay: --225--- ft
FYI*****(STANDARD COMMENT) FIRE FLOW/HYDRANT REQUIREMENTS MET: On this site fire flows are --4000-- gpm, and the numbers of hydrant(s) are -2--- based on a THEORETICAL Report. This site, based upon the provided theoretical modeled fire flows, appear to meet the minimum flow requirements and/or the number of hydrant(s) for this structure.
FYI*****2016 NFPA 14: 6.4.5.4 FIRE DEPARTMENT CONNECTION: The fire department connection is located on the --SW Corner--- side of the building and is within --95--- feet of a fire hydrant.
FYI(STANDARD COMMENT) CONTACTS FOR FLOW TESTING HYDRANTS PUBLIC/CITY OWNED HYDRANTS: Contact SEAN HIGBEE, CSU at 668-4595 or via email at shigbee@csu.org to schedule an ACTUAL flow test. Be sure to provide them with a CSFD plan review number to include with their flow reports. CSFD need not be present when City Utilities flow tests hydrants as we will accept their reports. PLEASE ALLOW 1-2 WEEKS NOTICE PRIVATE HYDRANTS: Contact your assigned inspector to schedule a flow test of PRIVATE OWNED hydrants. A contractor capable of performing the test will be required as CSFD Inspectors WITNESS only. CSFD will not accept flow test results we have not witnessed.
FYI(STANDARD COMMENT) FIRE FLOW TESTING - NEW HYDRANTS: 2015 IFC 3312 All actual hydrant flow tests shall be conducted and witnessed by CSFD prior to the start of construction or the arrival of combustible material on site. It is the responsibility of the owner or their designated representative to ensure an approved water supply is provided.
FYI*****(STANDARD COMMENT) SCHEDULING INSPECTIONS 2019 Fee Schedule, --2--- inspections/ ----- hours (Inspection time is not transferrable) Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests in with ample time to allow scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2013-1234 - HS-1) The CSFD Approved sets of plans are to be on site for all inspections.
FYI(STANDARD COMMENT) REVIEWS: 2015 IFC 105.4.4 Colorado Springs Fire Department plan reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
FYI(STANDARD COMMENT) CLT REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Wyman "Chip" Taylor II, PE Fire Protection Engineer I 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7303 wtaylor@springsgov.com
9/26/2019 FYI*****(STANDARD COMMENT) This project is: Polaris Pointe Trampoline Center. located along the north leg of Spectrum Loop west of Voyager This plan review is based on the requirements found within the adopted edition of the International Building Code, International Fire Code and the related standards.
Disapproved*****(DISAPPROVED) COMMON DISAPROVAL ITEMS: See the following checked items for disapproved comments. Additional explanation to these items may be provided in comments following: ---XX-- Fire flow report from CSU with map has not been provided.
FYI(STANDARD COMMENT) CORRECTIONS All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax, email or verbally.
FYI(STANDARD COMMENT) THE DISAPPROVED ITEMS MAY NOT CONSITITUE A COMPLETE LIST OF VIOLATIONS. It is the responsibility of the design professional to conduct a complete re-review of the plans for additional violations of the adopted codes/standards and incorrect information prior to resubmitting.
FYI(STANDARD COMMENT) CLT REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Wyman "Chip" Taylor II, PE Fire Protection Engineer I 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7303 wtaylor@springsgov.com


 