NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

KINSHIP LANDING
00415 NEVADA AVE

Review DateStatusComment(s)
2/5/2020 FYI*****(STANDARD COMMENT) This project is: Kinship Landing, 415 S Nevada Ave New 4 Story Boutique Hotel Rapid Response This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI*****(STANDARD COMMENT) The fire sprinkler system is being installed by: Hydro Pro CSFD does not allow any combustibles into a building until a sprinkler system has passed it's final acceptance test performed by CSFD Inspector's.
FYI*****(STANDARD COMMENT) SPRINKLER SYSTEM DESIGN CRITERIA: Type of System: WET Type of head (s):k5.6 QR 200 degree Design Criteria: Ordinary II Adjustments:none
FYI(STANDARD COMMENT) FLEXIBLE SPRINKLER CONNECTIONS AND HEAT TRACE: Flex Connections: NO Heat Trace:NO
Approved/Corrected*****(STANDARD COMMENT) RED-LINED COMMENTS The following RED-LINED items are to be corrected prior to final inspection: 1. The 20 square foot "closet" leading to the bathroom does not meet the definition of a closet in the ADA Bunkroom and sprinkler protection must be provided.
FYI*****(STANDARD COMMENT) FIRE DEPARTMENT CONNECTION: The FDC will have --3--- 2 1/2" inlets connected to the system by a -4"---- pipe. The plans indicate the FDC is being installed --WEST--- of the building.
FYI*****(STANDPIPES) DESIGN INFORMATION: --X---Manual --X---Wet Hose Connection Location: --X---Intermediate Floor Landing ---X--Roof Number of Standpipes: --2--- Demand of --750--- gpm, at -144---- psi is needed at the SYSTEM GAGE; --144--- psi is needed at the CITY GAGE/FDC.
FYI(STANDARD COMMENT) LICENSED INSTALLER/SERVICE TECHNICIAN An On-Site Installer/Service TechniciaN shall supervise all on-site work on any fire protection system. This On-Site Installer shall have a current Installer Certificate (RBD Wallet Card), on his/her person, while on the job site.
FYI(STANDARD COMMENT) CPVC ROUGH INSPECTIONS: Sprinkler Heads shall not be installed on CPVC piping until CSFD has witnessed a visual rough-inspection of all piping and granted permission to install sprinklers.
FYI(STANDARD COMMENT) CONCEALED SPACES - This plan did not provide any information on combustible concealed spaces. NFPA 13 requires that "All concealed spaces enclosed wholly or partially by exposed combustible construction shall be protected by sprinklers". There are several specific allowances to this section that allow for the omission of sprinklers. If there are combustible concealed areas found during the installation of the system that do not meet the requirements of the NFPA 13, then these areas will be required to be sprinkled. (NFPA 13:8.15.1) IT IS THE RESPONSIBILITY OF THE INSTALLER TO MAKE SURE THAT THE SYSTEM IS INSTALLED IN ACCORDANCE WITH THE STANDARD.
FYI(STANDARD COMMENT) FREEZING CONDITIONS It is the designer's responsibility to provide the building owner with a system design that will continue to function reliably even under adverse temperature conditions. The sprinkler contractor must be conscious of field conditions that may affect the performance of their system, such as drafts, disturbed insulation, installation along exterior walls, etc. and incorporate such conditions into a reliable design.
Attention(STANDARD COMMENT) CERTIFICATE OF INSTALLATION: It is the installer's responsibility to certify through this form (attached to the plans) that the system has been properly installed and tested. NOTE! CSFD will no longer be providing these forms as they are now available online at: https://coloradosprings.gov/sites/default/files/inline-images/installer_certificaiton.xlsx The form is to be filled out in its entirety PRIOR TO THE ARRIVAL OF THE FIRE INSPECTOR conducting the final inspection and/or acceptance test of the system. FINAL INSPECTIONS WILL NOT BE CONDUCTED WITHOUT THIS FORM BEING COMPLETED.
FYI(STANDARD COMMENT) AS-BUILT PLANS All deviations from approved plans shall be documented and submitted to CSFD for archival. Reviews will not be conducted on as-builts, as these field changes are often verified as compliant by the fire inspectors. All as-built plans shall be conspicuously marked as such. Any changes requiring approval prior to Final shall be submitted as a REVISION.
Attention*****(STANDARD COMMENT) SCHEDULING INSPECTIONS 2019 Fee Schedule, --3--- inspections/ ---10-- hours (Inspection time is not transferrable) Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests in with ample time to allow scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2013-1234 - HS-1) The CSFD Approved sets of plans are to be on site for all inspections.
FYI(STANDARD COMMENT) ROUGH VISUAL INSPECTIONS: Rough Visual inspections shall be completed PRIOR TO any bucket tests or final inspections.
FYI(STANDARD COMMENT) CONCEALED WORK: The fire sprinkler piping shall not be covered up by walls, sheetrock, ceiling tiles, etc... prior to the CSFD visual inspections of the piping. If the piping is covered, and the inspectors cannot inspect it as is required by Fire Code, the walls,sheetrock, ceiling tiles, etc... will be required to be removed. If this means that finished ceilings will need to be removed, this will be required to be done! (IFC 106.3)
FYI(STANDARD COMMENT) PLAN REVIEW/PERMIT FEES: All fire department fees are to be paid prior to issuance of any permits. These fees must be paid directly to the Colorado Springs Fire Department - Development Review Enterprise - at 2880 International Circle - Suite 200-7.
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the 2003 International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)
FYI(STANDARD COMMENT) RTP REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Roland Peterson Senior Fire Inspector, CSFD 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7369 rpeterson@springsgov.com
FYI*****(STANDARD COMMENT) DISAPPROVED ITEMS ADDRESSED: The plans have been resubmitted and all the disapproved comments have been addressed and/or corrected as follows: 1. See scanned response letter.
12/31/2019 FYI*****(STANDARD COMMENT) This project is: Kinship Landing, 415 S Nevada Ave New 4 Story Boutique Hotel Rapid Response This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI*****(STANDARD COMMENT) The fire sprinkler system is being installed by: HydroPro Fire Sprinkler CSFD does not allow any combustibles into a building until a sprinkler system has passed it's final acceptance test performed by CSFD Inspector's.
FYI(STANDARD COMMENT) CLT REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Wyman "Chip" Taylor II, PE Fire Protection Engineer I 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7303 wtaylor@springsgov.com
Disapproved*****(STANDARD COMMENT) DISAPPROVED COMMENTS The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments: 1. Plans indicate that NFPA 13, Section 8.15.1.2.6 is being used to not protect the joist space between floors. Provide formal details on how fire stopping is being applied to meet this section and 11.2.3.1.5.1 (10). Also provide letter from general contractor acknowledging that they will be fire stopping the joist spaced per these NFPA 13 sections and the details provided. It is recommended that a meeting be set up with CSFD, GC, and Hydropro to review these fire stopping requirements prior to re-submittal. 2. Crosss section notes state that no sprinkler protection is being provided above the lowered bathroom ceilings. How are these ceilings being framed and is this space open to the joist space above? To ensure that proper sheet rock/framing is used to allow the omission of sprinkler heads within these spaces, also have the GC dictate the methods used for framing and sheetrocking of these areas in the letter required in reveiw comment #1. 3. Provide documentation in the letter required in review comment #1 stating that sheet rock is being installed behind all showers/tubs to meet the thermal barrier requirement of NFPA 13, 8.15.8.1.1 to allow sprinklers to be omitted from bathrooms. 4. Revise floor control valve assemblies to show check valves are provided per NFPA 14, 6.3.5. 5. Remove check valve shown in the standpipe/sprinkler supply shown righ outside stair 2. This check valve will prevent the FDC from supplimenting the water supply for the 1st floor and basement. 6. Sprinkler heads in 1st floor futuer open office are overspaced for Ordinary hazard design. 7. North end of 1st floor canopy is not properly protected with sprinkler heads and dry sidewall under canopy south of column line 3 is overspaced. 8. Provide additional sprinkler head on 2nd or 3rd floor of linen chute per NFPA 13, 22.1.5.2.2.1.4. 9. Why are you using a residential sprinkler head in 2nd floor corridor closet? 10. Hydraulic calculations have been reviewed and appear to be acceptable. Also review the disapproved plans for additional written comments prior to submittal of new plans.
Attention(STANDARD COMMENT) THE DISAPPROVED ITEMS MAY NOT CONSITITUE A COMPLETE LIST OF VIOLATIONS. It is the responsibility of the design professional to conduct a complete re-review of the plans for additional violations of the adopted codes/standards and incorrect information prior to resubmitting.
FYI(STANDARD COMMENT) CORRECTIONS All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax, email or verbally.
4/24/2019 ApprovedLinen chute is on the outside of building. Watch for proper freeze protection of sprinkler heads in chute.


 