NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

USOC UNITED STATES OLYMPIC MUSEUM
00200 SIERRA MADRE ST

Review DateStatusComment(s)
2/28/2020 FYI*****(STANDARD COMMENT) This project is: US Olympic Museum, 200 S Sierra Madre St, New Museum Building - phased build This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
ISingle interlock preaction valves will operate with detection. Verify correct fire sprinkler system solenoid activates per detection activated. Verify detection spacing is correct.
Attention Fire sprinkler revision approving preaction valves will be required prior to final sign off of fire alarm and fire sprinkler permits.
FYI***** REVISION: Scope of Revision: Monitoring and activation of preaction valves Date of Revision: 02/10/20 This review is limited to areas clouded and/or indicated as changed. Permit release for this splice or revision does not include other plan elements even if revised from prior submissions.
FYI***** DISAPPROVED ITEMS ADDRESSED The plans have been resubmitted and all the disapproved comments have been addressed and/or corrected as follows: 1. Areas covered by preaction systems identified on plans. 2. Fire sprinkler revision approving preaction valves will be required prior to final sign off of fire alarm and fire sprinkler permits.
FYIJAH REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Jeff Hanenberg Senior Fire Code Inspector 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7359 jeff.hanenberg@coloradosprings.gov
2/6/2020 FYI*****(STANDARD COMMENT) This project is: US Olympic Museum, 200 S Sierra Madre St, New Museum Building - phased build This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI***** REVISION: Scope of Revision: Adding releasing and monitor modules for Preaction Systems Date of Revision: 01/20/20 This review is limited to areas clouded and/or indicated as changed. Permit release for this splice or revision does not include other plan elements even if revised from prior submissions.
Disapproved*****(STANDARD COMMENT) DISAPPROVED COMMENTS The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments: 1. Sprinkler plans need to be submitted prior to fire alarm plans so that the preaction valves can be identified as far as single interlock, double interlock, and etc.. CSFD can then verify the application is correct for the sprinkler design. This design would tie in to your revision. 2. Plans indicate preaction zones, however CSFD would like to know exactly what devices activate preaction valve solenoids. Also review the disapproved plans for additional written comments prior to submittal of new plans.
FYICORRECTIONS All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax, email or verbally.
AttentionTHE DISAPPROVED ITEMS MAY NOT CONSITITUE A COMPLETE LIST OF VIOLATIONS. It is the responsibility of the design professional to conduct a complete re-review of the plans for additional violations of the adopted codes/standards and incorrect information prior to resubmitting.
FYIJAH REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Jeff Hanenberg Senior Fire Code Inspector 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7359 jeff.hanenberg@coloradosprings.gov
12/3/2019 FYI*****(STANDARD COMMENT) This project is: US Olympic Museum, 200 S Sierra Madre St, New Museum Building - phased build This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI***** REVISION: Scope of Revision: Delta 4 Revision: Move FACP from Basement Fire/Water Entry Room 22 to 1st Floor Storage Room 120A. Date of Revision: 9/18/19 This review is limited to areas clouded and/or indicated as changed. Permit release for this splice or revision does not include other plan elements even if revised from prior submissions.
FYIAS-BUILT PLANS All deviations from approved plans shall be documented and submitted to CSFD for archival. Reviews will not be conducted on as-builts, as these field changes are often verified as compliant by the fire inspectors. All as-built plans shall be conspicuously marked as such. Any changes requiring approval prior to Final shall be submitted as a REVISION.
FYICLT REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Wyman "Chip" Taylor II, PE Fire Protection Engineer I Colorado Springs Fire Department Division of the Fire Marshal 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7303 wtaylor@springsgov.com
8/2/2019 FYI*****(STANDARD COMMENT) This project is: US Olympic Museum, 200 S Sierra Madre St, New Museum Building - phased build This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI***** REVISION: Scope of Revision: Modification to detection and notification due to design changes. Adding RAS on main level and relocating panel and RAS Base station to riser room. Marked as revision #2 and #3 Date of Revision: 7/10/19 This review is limited to areas clouded and/or indicated as changed. Permit release for this splice or revision does not include other plan elements even if revised from prior submissions.
FYIREVIEWS: Colorado Springs Fire Department plan reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)"
FYIAS-BUILT PLANS All deviations from approved plans shall be documented and submitted to CSFD for archival. Reviews will not be conducted on as-builts, as these field changes are often verified as compliant by the fire inspectors. All as-built plans shall be conspicuously marked as such. Any changes requiring approval prior to Final shall be submitted as a REVISION.
FYIJAH REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Jeff Hanenberg Senior Fire Code Inspector 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7359 jhanenberg@springsgov.com
7/2/2019 FYI*****(STANDARD COMMENT) This project is: US Olympic Museum, 200 S Sierra Madre St, New Museum Building - phased build This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI***** REVISION: Scope of Revision: Modification to detection and notification due to design changes Date of Revision: 5/20/19 This review is limited to areas clouded and/or indicated as changed. Permit release for this splice or revision does not include other plan elements even if revised from prior submissions.
Disapproved*****(STANDARD COMMENT) DISAPPROVED COMMENTS The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments: 1. Encore Electric's RME must sign the cover sheet of the plans and the cover sheet of the cut sheets. 2. Provide CSFD Plan reveiw number on your plans, not the PPRBD permit number. 3. Plan review application must be filled out and attached to your submittals. 4. Provide narrative on plans describing the changes for this revision. Also review the disapproved plans for additional written comments prior to submittal of new plans.
10/12/2018 FYI*****(STANDARD COMMENT 1) This project is: US Olympic Museum, 200 S Sierra Madre St, New Museum Building - phased build This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI*****(STANDARD COMMENT 5) DESIGNER/INSTALLER INFORMATION Fire Alarm system was designed by: Convergint Technologies Fire alarm system is being installed by: Encore Electric
FYI*****(STANDARD COMMENT 6) FIRE ALARM SYSTEM DESIGN: -----Single Family Residential Fire Alarm System -----Manual --XX---Automatic -----Dedicated Funtion: ----- AUXILIARY FUNCTIONS: --XX---Elevator Recall --XX---Duct Detector --XX---Waterflow --XX---Door Release System also monitors the 2-way emergency communicaiton system and clean agent releasing panel.
FYI*****(COMMERCIAL) MONITORING Off-site monitoring of this fire alarm system is required and shall be provided by an approved monitoring agency. The phone number to be used to report a fire emergency is (719) 444-7632. Monitoring Method is: ----- DACT ----- Radio --XX--- Cellular ----- Internet Protocol (IP) ----- Other (please list)
FYI(CLEAN AGENT) RACEWAYS: Initiating and releasing circuits shall be installed in raceways. (NFPA 2001:4.3.1.3)
FYI(STANDARD COMMENT 13) LICENSED INSTALLER/SERVICE TECHNICIAN An On-Site Installer/Service Technician shall supervise all on-site work on any fire protection system. This On-Site Installer shall have a current Installer Certificate (RBD Wallet Card), on his/her person, while on the job site.
FYI(STANDARD COMMENT) COMPLETION DOCUMENTS AND DOCUMENT CABINET: The following documents/records shall be provided in a DOCUMENT CABINET: 1. Owner's manual and manufacturer's published instructions for all system equipment 2. Record/As-Built drawings 3. Completed/Updated Record of Completion 4. For software based systems, record copy of site-specific software 5. Certificate of Installation A DOCUMENT CABINET SHALL BE PROVIDED FOR ALL NEW SYSTEM INSTALLATIONS! NFPA 72: 7.5 and 7.7
FYI(STANDARD COMMENT) PRE-TEST REQUIREMENT: Before requesting final approval of the installation, the installing contractor shall furnish a written statement that the system has been installed in accordance with approved plans and testing in accordance with the manufacturer's published instructions and the appropriate NFPA requirements. (10.18.1.3) CSFD requires a 100% pre-test - Evidence may be documented on the Record of Completion.
FYI(STANDARD COMMENT) ACCEPTANCE TESTING: At the time of this inspection the Fire Inspector will expect ALL devices involved in this fire alarm project to be tested. The installer should be aware of the fact that in a larger facility there may by a need to isolate the fire alarm system to only the area being tested. The alarm installer is to insure that building owner and/or manager and the General Contractor has been informed of the test criteria, time and date of the test, and have given their approval. Acceptance testing shall be completed in accordance with Chapter 14 of NFPA 72
Attention(STANDARD COMMENT 11) ROUGH-IN PERMIT AND INSPECTIONS: All Fire Alarm systems wiring installed within the City of Colorado Springs must be inspected by the Pikes Peak Regional Building Department PRIOR TO the Fire Final on the system. This will require the installing contractor to obtain a Rough-In Permit issued by the Regional Building Department. Please call RBD at 327-2880 for additional information on how to obtain this permit.
FYI*****(STANDARD COMMENT 10) SCHEDULING INSPECTIONS --XX---2017 Fee Schedule, --2--- inspections/ --15--- hours (Inspection time is not transferrable) Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests in with ample time to allow scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2013-1234 - HS-1) The CSFD Approved sets of plans are to be on site for all inspections.
FYI(STANDARD COMMENT 19) PLAN REVIEW/PERMIT FEES All fire department fees are to be paid prior to issuance of any permits. These fees must be paid directly to the Colorado Springs Fire Department - Development Review Enterprise - at 2880 International Circle - Suite 200-7.
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department plan reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)"
FYI(STANDARD COMMENT) AS-BUILT PLANS All deviations from approved plans shall be documented and submitted to CSFD for archival. Reviews will not be conducted on as-builts, as these field changes are often verified as compliant by the fire inspectors. All as-built plans shall be conspicuously marked as such. Any changes requiring approval prior to Final shall be submitted as a REVISION.
FYI*****(STANDARD COMMENT 27) DISAPPROVED ITEMS ADDRESSED The plans have been resubmitted and all the disapproved comments have been addressed and/or corrected as follows: 1. See response letter.
FYI(STANDARD COMMENT) CLT REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Wyman "Chip" Taylor II Fire Protection Engineer I Colorado Springs Fire Department Division of the Fire Marshal 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7303 (F) 719-385-7330 wtaylor@springsgov.com
9/11/2018 FYI*****(STANDARD COMMENT 1) This project is: US Olympic Museum, 200 S Sierra Madre St, New Museum Building This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI*****(STANDARD COMMENT 5) DESIGNER/INSTALLER INFORMATION Fire Alarm system was designed by: Convergint Technologies Fire alarm system is being installed by: same
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department plan reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)"
Disapproved*****(STANDARD COMMENT 19) DISAPPROVED COMMENTS The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments: 1. Site Plan does not meet the requirements nor intent of said requirement. You have provided a vicinity plan, where site plans provide the actual site, access, etc indicating north direction. They assist with addressable devices having directional addresses and ensuring direction is correct. Reference 2009 IFC 105.4.2 regaring construction documents. 2. Matrix: you appear to be providing supervision for a dry type sprinkler system (low air pressure). 2016 NFPa 72: 17.16.2.2.2 requires monitoring of high air pressure as well. Correct matrix to include high air pressure. 3. Matrix: your matrix shows supervisory signals for 2-way communications, but sending trouble signals. Reconcile your matrix to ensure proper signal and transmissions match. 4. Matrix - Elevators: As of 11/7/17, elevators 1 and 3 are hydraulic and therefore do not have sprinklers at the top of the hoistway, therefore do no have shunt trip requirements. Elevator #2 is traction with non-rated belts, requiring sprinklers at the top of the hoistway (per NFPA 13) and will require shunt trip. Reconcile your matrix to indicate proper elevator input/outputs by type of elevator. 5. 2-way communication - you are indicating this is going to "an approved monitoring location." Who are you proposing is the "approved monitoring location?" 6. Battery calculations - FACP: the required 20% reserve isnot indicated, the total draw nor battery provided is not indicated either. Reference 72: 10.6.7.2. 7. Cafe Mechanical Vault - how will anyone working in the mechanical vault know if there is an alarm condition in the building(s)? 8. Archive 035: you have indicate there is a clean agent system in here, and the suppression system is by others. What about the alarm/detection of that system? Is that part of your scope or is that going to be part of the clean agent permit scope of work? 9. Archive 035: Initiating and releasing circuit wiring shall be installed in raceways 2018 NFPA 2001: 4.3.1.3. How is this being complied with? 10. Sheet FA-05: how is the required audible levels being met in the business/office areas? You have not shown any audible notification in these areas. Reference 2009 IFC 907.6.2.1.1. 11. Elevators: Verify appropriate RTI for the heat detectors in the shaft for shunt trip - the RTI is not the same as the temperature rating. 12. Kitchen: smoke detection is noted in the kitchen/cooking areas. location of smoke detection shall be based on an evalualtion of potential ambient sources of smoke, moisture, dust, or fumes and electrical/mechanical influences to minimize nuisance alarms. How is adding smoke detection to the kitchen addressing this requirement? 72: 17.7.1.9. typical to both kitchens 13.. Summer Games Rm 250, sheet FA-07: Notification appears to be lacking in this space. Please clarify how notification is to be achieved in this area. Also review the disapproved plans for additional written comments prior to submittal of new plans.
FYI(STANDARD COMMENT 20) CORRECTIONS All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax, email or verbally.
FYI(STANDARD COMMENT) DEW REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Doreen "Dee" Withee, PE Fire Protection Engineer II, CSFD 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7361 / (F) 719-385-7330 dwithee@springsgov.com
11/7/2017 ApprovedElevator 1 & 3 are going to be hydraulic. Elevator 2 is machine room-less with non rated belts.


 