Back to City Engineering
line

Public Works - HOME
line
Roadway Team
line
Engineering Development Review
line
Stormwater
line
Permits, Applications and Fees
line
Pikes Peak Rural Transportation Authority (PPRTA)
line
*Academy/Fountain and Academy/Pikes Peak
line
*Austin Bluffs and Nevada Avenue Intersection
line
*Austin Bluffs Bridge Widening at Cottonwood Creek
line
*Austin Bluffs Corridor
line
*Austin Bluffs Interchange at Union Boulevard
line
*Bridge Repair and Maintenance
line
*Cimarron Street Bridge
line
*Congestion, Incident Management, and Signal Improvements
line
*Constitution and Circle
line
*Constitution Avenue and Chelton Road
line
*Fillmore and El Paso Intersection Improvements
line
*Fillmore Street - Hancock to Union Boulevard
line
*Fillmore Street Corridor Improvement Project
line
*Fillmore Street Corridor Transportation Study
line
*Hancock Avenue Bridge over Templeton Gap Floodway
line
*I-25 Interchange Companion Projects
line
*North Nevada Avenue Bridge Rehabilitation Project
line
*On-Street Bikeway Improvements
line
*Powers Boulevard Right of Way Protection/Acquisition
line
*Proby Parkway, Phase 1
line
*Roadway Safety and Traffic Operations
line
*Vincent Drive
line
*Woodmen Road
line
Reference Materials
line
Reimbursements
line
Pavement Design Criteria Manual (pdf)
line
Local Improvement Districts
line

Frequently Asked Questions
line

PO Box 1575, Mail Code 410
30 S. Nevada Ave, Suite 401
Colorado Springs, CO 80903
Phone: (719) 385-5918
Fax: (719) 385-5537
Email: cityengineering@sp. . .





City of Colorado Springs / City Engineering / Pikes Peak Rural Transportation Authority (PPRTA) / On-Street Bikeway Improvements

On-Street Bikeway Improvements

On-street bikeway improvements on Scarborough Drive
On-Street Bikeway improvements on Scarborough Drive
The City's Comprehensive Plan and Intermodal Transportation Plan (ITP) recommend that streets be designed to accommodate safe and efficient bicycle travel. There are many locations in the city where safe and adequate bicycle travel and accessibility are not provided.

The projects funded by this program will:

  • Improve existing and construct new bicycle lanes in accordance with the ITP.
  • Develop and install improved signage directing bicyclists to and from bicylce lanes, routes, and trails.
  • Improve the safety and accessibility of trail/street crossing locations.
  • Improve access between the off-street trail network and roadways.

 

Project Manager: Kristin Bennett, Traffic Engineering,  (719)385-5908